BOM V/s Production Order Req Qty V/s Withdrawn qty

Dear Experts

Is there any standard report where we can get the Exact

BOM Material -Material Des Bom Requirement Qty -Production Order Requirement Qty -Qty Withdrawn--Difference

Basically BOM v/s Production order information system.

Thanks & Rgds

Pankaj Agarwal

Add a comment
10|10000 characters needed characters exceeded

Related questions

4 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Apr 16, 2011 at 11:03 AM

    What you're looking for is not available as such in a single report.

    If you want to compare BOM & component list of production order use CS14, but this wont give the qty. withdrawn details.

    If you want the qty. withdrawn details as well, you can download the report from COOIS (layout - component), i.e. per production order, you can get the details of material, requirement & withdrawn quantities. Then get the BOM details from CS03 or CS12, then excel compare.

    But if you want to have a single report, then build a custom report. FM for BOM - CS_BOM_EXPL_MAT_V2 and for production order - BAPI_PRODORD_GET_DETAIL. (If you want to do it table level, then SFO - RESB for components, any header level details then you can use AUFK, AFKO, AFPO & for BOM - MAST, STKO, STAS, STPO). Provide your specification to your developer and a simple Z report can be done for the same.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Apr 17, 2011 at 12:59 PM

    dear:

    it is not a good to use BOM and compare by excel.

    i suggest you use the query report.

    for process order i use RESB and CAUFV tables.

    RESB is also ok for production order.

    RESB-BAUGR Material number of higher-level assembly

    RESB-BDMNG Requirement Quantity

    RESB-ENMNG Quantity Withdrawn

    RESB-LGORT Storage Location

    RESB-MATNR Material Number

    RESB-POSNR BOM item number

    RESB-POTX1 BOM Item Text (Line 1)

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Apr 18, 2011 at 04:29 AM

    Hi Pankaj Agarwal,

    You can use MCRX / MCRE Std SAP report for Comparing Production order req qty Vs Withdrawal qty.

    Subbu.l

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Apr 18, 2011 at 09:36 AM

    Hi dear,

    You have to create Z report to get the BOM quantity and Production Order quantity.

    To get Production Order qty and withdrawn quqntoty you can make use of Std. T. code COOIS.

    COOIS -> List -> Components - > Enter Production Order no - > Execute report.

    On te displayed screen you can see Required quantity and With drawn quantity if you are unable to see any field go to change layout and get the field in the displayed column list.You can also get the shortages ( difference between required and with drawn quantity)

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.