Vendor Requirements

Hi,

Please let me know how can we identify the requirements for a vendor in MD04 screen. In collective access I see an option for vendor and it shows the material for vendors, please let me know that how can all the requirements can be taken into single PO.

Thanks.

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Apr 13, 2011 at 03:39 AM

    HI,

    Check with the Transaction ME59 where PR is not assigned to Vendor & ME58 where PR is Assigned to vendor.,

    1.Select the desired vendor as input parameter,

    2.System will list down Unassign & Assigned PR, Select the vedor & process to create the PO

    3.System will take all the PR relevent to single vendor in a PO.

    Regards

    Mascot.

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Jürgen Lins

      Hi,

      Could you provide more inputs on this please because when I go into collective access in MD04 wrt a vendor "XX", I see many different materials but when I try to create a PO I see only requisition of one material. In ME21N I went into the option 'change breakdown' where I selected the vendor option, so the requisition automatically poped up but I didnt enter vendor name.

      In ME57 I enter the vendor as an input and I see 7 requisistions, please let me know how can we select all the requisitions in one shot into a PO for specific vendor.

      Thanks for your time!!!!!

  • author's profile photo Former Member
    Former Member
    Posted on Apr 15, 2011 at 01:54 AM

    1.you can easily get the PR list of these 50 materials of one vendor by PR report ME5A of sap.

    2.copy these PR number and collective transfer into PO under ME21N.

    Add a comment
    10|10000 characters needed characters exceeded

    • I think you know that these 50 materials have to be procured from one vendor, but SAP does not know this,

      Hence you cannot see the 50 requisition in ME57 if you use the vendor number as selection criteria.

      This means that you have no source assignment for all the requisitions. And no you do not need to have fixed vendor for all of them. ME57 is the transaction to assign the vendor, source can be a contract, info records, source list...

      Of course you have to use a selection that enables SAP to find all 50. Vendor number is certainly not the right selection to start with.

      What do the materials have in common? the purchasing group? the MRP controller?

      Use this to select the requisitions, then do the source assignment for all requisitions that do not yet have a source.

      After this is done, you create a PO per Assignment, which is the vendor number, And you will then find all 50 requisitions to this one vendor in the document overview of PO creation screen.

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.