Hi,

In alocation structure of the settlement profile 3 cost elements groups are there, same settings are there in different client, now same fi cost object WBS document posted in both clients and settlement of the WBS done to AUC in both clients in CJ70 for both WBS line items generated... but with different cost elements.

WBS were with same data .. organization structure in different client, AUC etc.

Settelemet profile settings are also same...

But after settlement how system is picking one cost element in one client and another cost element in another client and showing in CJ70?

... Information: the two cost elements are present in two different cost elements group... these groups are in the same settlement profile's alocation structure which are used in both clients settlement rule for perticular WBS stated above.

Can anybody through light on this bug?

Thanks and regards,

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Apr 12, 2011 at 02:46 PM

    SAP Coligues,

    Looking for the reply... plzzz.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.