Skip to Content
0
Former Member
Apr 08, 2011 at 07:40 PM

Scheduled reports to Adobe fail sometimes

12 Views

I have two reports that I moved from XI 2 to XI 3.3 that fail sometimes but not always. The two are scheduled to be sent via email in Adobe format. If I change the format to XCEL the reports are sent.

The report schedule error message is:

For input string: ""

I can't seem to determine what input string it is referring to. There are numerous other reports that are sent via Adobe with no problems.

Any thoughts as to what to look for would be appreciated.