Hallo, we use material cost estimate with transfer control. Transfer strategy is: 5 Other Cost estimate, 4 Period Based-Transfer.

We have two materials A and B, B is a component of A. There is a Cost Estimate material B with status KF, when we cost a material A, system do not choose Cost Estimate material B with status KF, the system again explodes the BOM, costing and overwrites the existing cost estimate with the same status KF.

How to get to work Transfer control with cost estimate status KF

Thank you for your help.

Edited by: stooden on Apr 8, 2011 8:03 PM