on 04-06-2011 7:17 AM
Dear All,
I am facing a problem, my batch determination at delivery level and material available in different batches, when i am doing delivery material picking wrong batch whose stock is not available when i check in delivery Batch split display, it display available quantity 9,999,999,999 which is not actual.
Please suggest me where is my mistake or what need to do so that available quantity should display correct, earlier it was coming as per available quantity but now coming wrong.
Please help me.
Thanks & Regards
Prashant
SAP OSS Note 619911 - FAQ: Batch determination-point 9 explains the reason for this(mentioned above). To avoid this, in t.code OVZ9, check the box Check without RLT. Then create a new sales order->delivery and check again.
Regards,
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Prashant,
It is a 'normal' system behavior when the availability is checked
with the replenishment lead time and when the requirement date of
the material falls after the end of the replenishment lead time. You
cannot set the availability so that the system checks with the
replenishment lead time at material level but without the
replenishment lead time at batch level. For materials that are
subject to batch management requirements, check the availability
without including the replenishment lead time.
regards.
david
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
106 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.