Hi ,
I was trying costing a material in ck40n using standard costing variant.Here if I don't specify any
Transfer control, I am able to cost the material multiple times. How ever if I use a specific transfer control,
The material is nor getting selected for costing run.Is there any specific reason for the same.
Please highlight.
Regards
Rudra