on 04-04-2011 1:43 PM
Mates
I have used CAT5 and CATA tcd to transfer data to PS .It throws "No records for transfer to PS" errror.Transfer of data to HR(2002) Inftyp seems to be fine.
I have checked CADO tcd and the status is in approved and checked CATSDB table aswell for doc number
https://forums.sdn.sap.com/thread.jspa?threadID=1351887
i also checked KL03 for activity type /conrtollng area
could you kndly share your thoughts to address this
No Worries
KG
Hi KG,
Please check if you have data on CATSCO interface table. The data is transferred to CO based on the interface table.
For more information, please have a look at:
http://help.sap.com/erp2005_ehp_04/helpdata/EN/64/4004a4470211d189720000e8322d00/frameset.htm
Giving the HR example, when you transfer data to HR, the data contained on interface table PTEx2000 is the one relevant to be transferred.
On the following link, you have further info on the t-codes and interface tables for each of the components:
http://forums.sdn.sap.com/thread.jspa?threadID=783709
Hope I have clarified.
Rgds,
Bentow.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Bentow,
Thanks for the helpful links and valuable inputs.The CATSCO and ptex2000 table has the entries.
It looks like the CATSD-RNPLNR and CATSD-VORNR are mandatory isnt it?i have liased with PS consultant to share the details.plz correct me if im wrong.The second point of process flow states that You must have made an entry in the following fields: Field Name
Data Element
Short Description
RNPLNR
NW_AUFNR
Network number
and
VORNR
VORNR
Operation number
or
UVORN
UVORN
Suboperation
which i havnt maintained in time sheet.
Also feel the below will be useful for our mates
http://forums.sdn.sap.com/thread.jspa?threadID=1514849
http://www.sapprojectsystem.com/sap-ps-transaction-codes/
No Worries
KG
Hi KG,
Just saw your reply man, apologize.
These fields are all relevant to PS, but you can configure whether they should be or not mandatory. I'm not very fluent in PS to give you a final confirmation.
What I can contribute for you are all the fields and target components for CATS.
Please check at:
http://wiki.sdn.sap.com/wiki/display/ERPHCM/OverviewoftheFieldsandTargetComponentsforCATS
Hope it contributes.
Best Regards,
Bentow.
hi,
I was browsing through the forums, where I am having the same issue and thought you might help me on this.
Issue:
When I go to CJI3, and run the report for a Network - Activity which the CAT2 entries were made, the report doesn't show any values. I see a message: Confirmation of Network XXXXX Saved, and ConfIrmations generated = XX, when CATA is run. I checked the Tables: CATSCO & PTEX2000 as mentioned by you.
I see the postings made against Network - Activity in PTEX2000, but not in CATSCO. I did see few records were having an 'X' (Cancelled) - not sure why the records are getting cancelled. The timesheet entries were made in CAT2 against a Network - Activity.
Note: I was able to see the values being populated in CJI3 for entries made against a Project -> WBS Element.