Hi,
Could help me figure out why for a Make-to-Order sales order, two productions were generated? The Production Order was already processed (until TECO) but when we ran the MRP, another planned order was generated for the sames sales order. No open quantity for the sales order, and no data was changed for that sales order.
Appreciate all the help that I could get from you experts. Thanks.
Dear,
Check in MD04
I feel ,sale order requirement is still exist in system.
if yes
run the program SDRQCR21 in se38
enter material no & plant
with tick in planning file entry and data transfer
system will delete the reqmt and then run the MRP
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
IF sale order is relevant for MRP, system will show - ve qty in MD04
This -ve qty will trigger the MRP requirement
Possible reason is Inconsistency in sale order level
for that reason only
SAP has provided the Correction program SDRQCR21 - recovery of sales and delivery requiremnt
Run Once in SE38 , system will delete the inconsistency sale order requirement In MRP
and then run MRP for the material, system will delete plan order