on 03-31-2011 1:18 PM
Hi experts,
As per the business process, I need to maintainthe temperature in Routing, and and i dont want to confirm the same. For reporting purpose I have to fetch the same value.
Regards,
Sudha
thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
6 standard values can be maintained for each operation of routing. Are you using all of them? Consider one of them to be used for storing the temparture. dont maintin formulas for the same in workcenter so it is not relevent for costing..
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Sudhakar,
Check by creating user defined field in T Code OPEC and you can assign this in the operation details tab and maintain the value for
each operation.
Regards
Mangalraj.S
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
89 | |
7 | |
7 | |
4 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.