Hi
Harish here
Can any body give me the technicality behind the planning, how shift sequence will consider.
For ex: i have created the wc and for that i have created the capacity as machine. in the capacity header i have entered the factory calendar and start time as 9.00 am and end time 5.30 pm and break as 1h. also i have created the group of shift sequence in that i have taken as general shift. that is only one sequence ( 9AM-5.30PM no break consider) that has been assigned to above category
How the system is selecting the sequence for the group (enter in capacity catagory) as well as calendar and arrives the dates of schedule.