on 03-29-2011 6:18 AM
Dear Experts,
Consider the following scenario.
We have materials with characteristics and we have depots across India.
The product is being manufactured at factory in Jumbo rolls and are slit based on the customer requirements. The slit materials are either sold from the factory or sent to depots for sale from there. For some of the depots, the jumbo rolls are transferred to the depots and they are slit at the depot itself and will be sold from there. The slitting process is addressed through the tcode mill_cut. As per excise, the slit process is allowed at Depot.
The materials are maintained based on a characteristic of width. RG23D is updated with this characteristic at the time of making the GRN at the Depot. After doing the slitting process, when i try to update RG23D for this slit material with the original GRN, it is throwing an error saying the material doesn't exist in the original entry.
How do i overcome it? please help us at the earliest.
Thanks
Suresh
Dear friend,
Hope u have maintained the data's in J1id and try to maintain the Input material and Output materail in cenvat determination.
Regards,
Sudhir
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.