Skip to Content
0
Former Member
Mar 28, 2011 at 09:08 PM

Transferring master data from SCM to R/3 system

15 Views

Greeting..

I want to send lotsize master data from scm system (APO) to R/3 system when a user change this field APO(SCM) system.. can I use PPF to do that.. if yes.. what is the badi name that is related to this action ..

Thanks