Inspection plan assignement

21 Views

Dear Experts,

I have one issue in 04 inspection lot.

I have made config setting as one inspection lot per order, so production even the do multiple time ticket confirmation for production order quality gets only one inspection lot. one of the production order after time ticket ( GR ) confirmation for example out of 10 confirmation production cancel 4 confirmation(102 movement) and again they did confirmation for the same order. Now in the inspection lot quantity shows both 101 movement quantity + 102 movement quantity. example 5.5Lacs but actual confirmation shows 101movemt quantity ie. 3.1Lacs but my problem is I am using sampling scheme in the inspection plan as per the regulatory requirement we can't define batch size more than 5Lac. due to the above reason we can't able to assign inspection plan for that inspection lot.

Can any one advice how to resolve this issue.

Thanks.