We have defined a Cost Object Hierarchy. In the Cost Object Hierarchy , there are multiple cost object nodes. These cost object node represents each Prodcution line.
There is a requirement that any material can be produced in any production line.
The issue I am facing is if I am assiging one material to one Production line, and again if I am trying to assign the same material to other production line, the system is not allowing me to assign it.
How Can I resolve this issue.
kindly help.
regards