Skip to Content
0
Former Member
Mar 28, 2011 at 05:15 AM

Assignment of Materials to Cost Object Nodes in Cost Object Hierarchy

339 Views

We have defined a Cost Object Hierarchy. In the Cost Object Hierarchy , there are multiple cost object nodes. These cost object node represents each Prodcution line.

There is a requirement that any material can be produced in any production line.

The issue I am facing is if I am assiging one material to one Production line, and again if I am trying to assign the same material to other production line, the system is not allowing me to assign it.

How Can I resolve this issue.

kindly help.

regards