REM profile for finished material and its raw material

Former Member
0 Kudos

Dear Experts

My question is ,for a repetitive manufacturing scenario

1) We are maintaining REM profile finished material . Is it necessary to maintain REM profile for its raw materials ?

2)For raw materials do we need to create the seperate REM profile which is having seperate stock determination rule ?

Regards ,

Vishwas.K

Accepted Solutions (0)

Answers (1)

Answers (1)

sundaresan_velayudam
Active Contributor
0 Kudos

1) We are maintaining REM profile finished material . Is it necessary to maintain REM profile for its raw materials ?

not reqd

2)For raw materials do we need to create the seperate REM profile which is having seperate stock determination rule ?

not reqd

Former Member
0 Kudos

Dear Sundaresan

Thanks for the reply ,but for raw materials and finished materials storage locations willbe different ,then for raw materials how system will check in which storage location it should consume first ?

Regards ,

vishwas.K

madlercm
Active Contributor
0 Kudos

You can maintain the storage location determination on either material master or production version.

sundaresan_velayudam
Active Contributor
0 Kudos

for raw material maintain stock determination group in MRP 2 view.

former_member184655
Active Contributor
0 Kudos

Dear Vishwas,

1.REM profile assignment is required only for the materials for which production confirmation will be made through T code MFBF or

MF42N.

2.For stock determination rule check in control data 2 in the REM profile itself. This setting is linked to the REM profile and further to

the goods movements posting for the raw materials.(check this setting in T code OSP2).

Regards

Mangalraj.S