HI All,

Could you please let me know why I do not find stock for a component while veiwing the consignment stock in storage location due to which there is an error at the time of goodsmovent while confirming production order.But, there is a consignment stock in MMBE.

Please share your ideas this is ASAP

Accepted Solutions (0)

Answers (5)

Answers (5)

Former Member
0 Kudos

Hi,

As you already aware, knindly check the configurations in OSPX and OPJ2 for both plants, kindly check the SDG. In addition to that have a look into the material master if all the necessary settings are there in both the plants.

Thanks,

JK

Former Member
0 Kudos

Hi,

In the configuration MM- IM and PI, go to Stock determination and then assign stock determination in applications,

pl check is there any stock determination group for the movement type 261 and also for the Order type under production

thanks,

JK

Former Member
0 Kudos

Thanks for your reply , I had checked stock determination group is assigned in MRP2 veiw and also in MM -IM -PI and also 261 mvt type is there , with this settings it is ok in one plant and not in other

1. In one plant 1125 at the time of confirmation when we click on the goods movement tab I can see Stock type k and Vendor number 57 is directly picking and is visble in the goods movement tab against the Vendor consignment stock component A ...Which is ok and also not giving any ERROR in COGI

2. BUT for 1183 at the time of confirmation when we click on the goods movement tab I cannot see Stock type k nor Vendor number 57 is not at all visble in the goods movement tab against the Vendor consignment stock component B ...Which is FALLING in COGI ..

What are the setting we can do or check so that this Stock type K and vendor number appears

Thanks

Himakar

Former Member
0 Kudos

Hi,

To Consume consignment stock, one of the configuration you require is Stock determination group, and attach the group in MRP2 view, please check your raw material master.

Thanks,

JK

Former Member
0 Kudos

Stock determination group is mainatained in MRP2 veiw. now my issue is even though there is stock in Storage location for consignment

1. At the time of godds movement When i chek the stock for the component , i am unable to see the stock in the goods movement screen against the component where as In mmbe there is stok

2. When confirmation is done this component is falling in cogi , even though there is vendorconsignment stock in mmbe and stock determination group is mainatained in MRP 2 veiw

Now to consume this compoment from vendor consignement stock automatically when we confirm what are to be mainatained

Please help

Thanks

Himakar

Former Member
0 Kudos

Stock determination group is mainatained in MRP2 veiw. now my issue is even though there is stock in Storage location for consignment

1. At the time of godds movement When i chek the stock for the component , i am unable to see the stock in the goods movement screen against the component where as In mmbe there is stok

2. When confirmation is done this component is falling in cogi , even though there is vendorconsignment stock in mmbe and stock determination group is mainatained in MRP 2 veiw

Now to consume this compoment from vendor consignement stock automatically when we confirm what are to be mainatained

Please help

Thanks

Himakar

madlercm
Active Contributor
0 Kudos

MMBE is NOT AN AVAILABILITY view. Use transaction CO09 to simulate availability view; use the same checking group as in the order.

Former Member
0 Kudos

Dear

Please check in t.code COGI w.r.t. material

Regards ,

Vishwas.K