Hi,

I have a problem regarding EAN codes within MDM. If a material is created within MDM and a EAN code assigned to the material and the records is syndicated to ECC it all works fine.

Now later we find out that the EAN code is to be removed and left blank. When syndicating this change to ECC the material is not updated.

It works fine when changing the EAN code but not when removing the EAN code.

If you do it manually within ECC you get a warning and then the EAN code is removed. I know you also have to mark a main EAN code within the additional data -> Additional EANs and ECC assigns this automatically if you change EAN codes and automatically removes this when removing the EAN code.

What is needed to syndicate a removal of EAN code to ECC from MDM?

Kind regards

Henning

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • avatar image
    Former Member
    Mar 08, 2011 at 01:38 PM

    Forget about this one.