Hi,

While creating the PCE for one of the finished materials, in the PCE, the phantom material is not getting selected.

There is no issue with the production version or BOM or Master recipe since in the process order after the BOM explosion the phantom material is being picked up.

The costing date of the PCE is also as per the production version validity date. In the BOM & master the phantom item is maintained for costing.

Let me know what else could be missing.

Thanks in advance,

Regards,

Abhijit

0 Kudos

Closed

Accepted Solutions (1)

Accepted Solutions (1)

0 Kudos

Product Cost Estimate.

Problem solved. I forgot to check few things in BOM. Check below.

Answers (2)

Answers (2)

Former Member
0 Kudos

There is no problem with the costing run. If a material is marked as a phantom assembly (that is, it has a special procurement type with procurement type: In-house production and special procurement: Phantom assembly ), costing directly explodes the BOM and calculates the planned costs for all material components in the phantom assembly. These material components are displayed and updated in the cost estimate of the higher-level material, but not in the phantom assembly. The idea is, phantom assemblies are not needed to be costed as they are not valuated and neither stock is maintained for them. But their cost structure is exploded properly for the costing run.

0 Kudos

Hi Hasan,

Yes you are correct. As I said earlier I checked the costing relevancy of Phantom Assembly but forgot to check the costing relevancy for the items in Phantom Assembly. Found the root cause.

Thanks anyway.

Regards,

Abhijit

Former Member
0 Kudos

What is PCE stands for? Sorry for a silly question.