Former Member
Mar 05, 2011 at 05:44 AM

validy of a BOM component

48 Views

dear gurus

When i create a BOM for a material, Can i define seperate dates of validity for each component of the BOM.

As the system takes the "Valid from " date todays date(BOM Creation date) and "valid till" date as a future date defined as the validity of that BOM.

For example.

I want to create a bom ABC having components as material M,N,O,P

now if i have defined the BOM validity as 1/1/2011 to 1/1/9999

and validy of material M,N,O as the BOM validity i.e 1/1/2011 to 1/1/9999

but i want to define the validity of materail P as 1/1/2011 to 1/2/2011

Is this possible?

Also can i view a material whose validity is finished while viewing a BOM by CS03?

Pls Help

REGARDS

Edited by: vatsagaurav on Mar 5, 2011 11:15 AM