dear gurus
When i create a BOM for a material, Can i define seperate dates of validity for each component of the BOM.
As the system takes the "Valid from " date todays date(BOM Creation date) and "valid till" date as a future date defined as the validity of that BOM.
For example.
I want to create a bom ABC having components as material M,N,O,P
now if i have defined the BOM validity as 1/1/2011 to 1/1/9999
and validy of material M,N,O as the BOM validity i.e 1/1/2011 to 1/1/9999
but i want to define the validity of materail P as 1/1/2011 to 1/2/2011
Is this possible?
Also can i view a material whose validity is finished while viewing a BOM by CS03?
Pls Help
REGARDS
Edited by: vatsagaurav on Mar 5, 2011 11:15 AM