F-48 Down Payment posting to Fixed Asset

Dear Sap gurus,

We have a case where we have created a PO with a generic material with Acct Assignment Category as "A" for Asset. In the Account Assignment, we enter the AUC number, Internal Order number and other relevant details.

We then make a down payment to the vendor using tcode F-48. In this, we enter the PO number and its line item as the in the second screen. When we press enter, we get the Asset number in the field in the second line item.

When we simulate, we get 4 line items, as under :

Vendor Debit (Special GL)

Bank Credit

AUC asset Debit

Asset Clg Credit.

Since, the line items 3 and 4 are generated, the system asks us to enable Asset postings for document type "KZ" for the down payment.

We do NOT want to have the line items 3 and 4 being generated. We just want the following entry when doing F-48 :

Vendor Debit (Special GL)

Bank Credit.

How can we get this done ?

Please help.

Thanks in advance.

PS : In a standard system these line items 3 and 4 are NOT generated.

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • Best Answer
    avatar image
    Former Member
    Mar 04, 2011 at 06:13 AM

    Hi Sreecheera,

    You can achieve this by following the steps below:-

    1. Create a New Field Status group as a copy of G067 and assign Z067(Suppress Assets here) to your Vendor related recon accounts... (Special GL A)

    2. Now when you create a down payment request in F-47, you will get an error F5 378...

    3. Supress this error message in OBA5 - Enter Work area as F5 in OBA5 and supress the message no 378 to W.

    Regards,

    SAPFICO

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi Sreecheera,

      As you said that in account assignment we enter the AUC and internal order number but i didnt understand where exactly we will assign whether it is obyr or some were else please tell me how to pay down payments to asset  i am trying with above your solution but i didnt under stand please tell me the process