two materials ordered separately from vendor to be used as single material

Former Member
0 Kudos

Hi All,

Suppose there are two materials say A and B which are ordered separately from vendor and then placed in storage location as two diffrent stock materials.

But while issuing the goods, these two materials A and B need to be combined as different material C and has to be issued against.

Please let me know if there is any possibility of such scenario.

Regards

Accepted Solutions (0)

Answers (4)

Answers (4)

BijayKumarBarik
Active Contributor
0 Kudos

Hi,

Two materials A and B which are ordered separately must be created with same material type(say ROH) & a different material C must be created with a separate material type HALB.Now can keep /create BOM for material C where you can mixing combination of materials A and B.

You can issue now material C after mixing of materials A and B.( after receiving to warehouse).Just get help from PP consultant.

Regards,

Biju K

Former Member
0 Kudos

Hi

Your Requirement is not possible in Std SAP, until and unless you perfom any operation in both material ( A, B)and the final product of component is material C

ajitkumar
Active Contributor
0 Kudos

Make a BOM with C as the header material , A & B as item.

GI A & B to a production order and GR C

you will have to maintian the configuration for PP

kailas_ugale
Active Contributor
0 Kudos

Hi

sorry I am not getting you

suppose material A

material B

you have this two material in storage

now issue these two material for production

you will get one semi finish or finish material C

issue this material C

you have two show consumption for material A and B,to get material C

Regards

Kailas ugale