hi all,
i want to use strategy 70 assembly planning but at the same time to use gross requirements planning which means that i want to plan on the assembly level and Dependant requirements consume PIR but without taking warehouse stocks into account
is it possible?
regards
Ahmed Sobhi
any suggestions?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear ,
I have n't tried before this scenario,
please follow the step to achieve your requirement
In Sand Box
Create a requirement class as Y11 in OMPO
maintain consumption indicator as 1 & planning Ind as 2 Gross requirement planning and category as Planned Independent Requirement
Create a Requirement type Y11 and assign the requirement class Y11 in OMP1
and create a strategy Y11 in IMG>prdn>prdn planning>DM>pir-->planning strategy --> define planning strategy
and assign the reqmt type Y11
and assign the strategy in material master and check out result
If the result suits your business reqmt configure it in DEV system