dear gurus
i have created a workcentre and then i did routing for a material to be produced inhouse. But when i define the workcentre in the operation tab of routing, here the system should automatically pick the values from WC ( values like SMH, c category consumtion,etc), after i put the control key there, but all these values are "0.00". is there any problem in routing or there is problem in WC creation?
Pls Help
REGARDS