Skip to Content
author's profile photo Former Member
Former Member

EWM Layout oriented storage control config

Hi experts,

We are trying to configure the layout oriented storage control. We have done the required config as per our understanding. The system is identifying the requirement of the intermidiate step for the defined destination storage type.

The issue is, system is creating only one warehouse task to move the HU to ID point. It is not creating the second task to move it to final location. So basically, it is just replacing the final destination (as per the putaway logic) in the task to the ID point defined in layout oriented settings and not splitting the task.

Any pointers to the missing config / logic.

Thanks in advance.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Mar 01, 2011 at 09:19 AM

    Hi,

    AFAIK there is nothing missing... This is standard SAP logic for a ID point scenario.

    Best regards

    Juergen

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.