Dear Expert,
There is a requirement for costing run with BOM which contains alternative parts.
For example, in CA01, BOM is maintain as such,
Part A which is quantity 1 pcs, alternative item group B, priority 1, usage probability 50%
Part A-1 which is quantity 1 pcs, alternative item group B, priority 1, usage probability 50%
when explode the BOM using CS12 and during running of backflush,
Part A shows 0.5 pcs
Part A-1 shows 0.5 pcs
However, for cost estimate,
Part A shows 1 pcs with cost RM 1
Part A-1 shows 1 pcs with cost RM 1.5
and the cost had been encounter twice (total = RM 2.5) where this is incorrect.
It should be as following:
Part A shows 0.5 pcs with cost RM 1
Part A-1 shows 0.5 pcs with cost RM 1.5
and total cost = RM 1.25
I had searched through the forum, most of the forums recommend on mixed costing.
However, this will require to maintain 2 BOM, 2 production version and some configurations.
Is there any other way to run 1 cost estimate which is able to pick up the ratio just like backflush?