Hi Gurus,
How to handle alternative BOM in REM back flush.
I have FERT, and it is having alternative BOM (Alt-1 & Alt-2).
Alt-1 BOM :Steel coil =2' x 2'
Alt-2 BOM: Steel Coil =2.2" x 2.0
when shortage in steel coil 2x2, we use 2.2x2.0
During backflush, system should consider Alt-2, when there is no stock of Alt-1. how to handle this situation in REM backflush.
Please guide me,
thanks in advance.
Anand