Hi,
I have 4 company codes assigned to 1 controlling area XX01 and assigned controlling area to op.concern OP01. After some time business doesn't want one of the company code from the above 4 co.cd values to flow into COPA. Is it possible to restrict that particular company code i.e to stop flowing the data into COPA, if possible how do we do.
Regards,