Dynamic safety stock

27 Views

Hi all

In my system the Coverage profile defined as below, is it correct?

I mean if the Period ind:M, is it possible to define First period's Number of periods=24.

The other one is Number of periods:3. can second and horizon all indicator is 0

You can find the details from below:

Coverage profile:001----->

Period ind:M. Number of periods:3. Type of per.length:1 Days per period:0

First period: Min=0 Tgt=3 Max=0 Number of periods=24

all the indicator in second and horizon period are 0.

Safety time ind:2

Safety time/act.cov:15 days.

If all of this is right, how the system calculate the SchLne generate date?