Hi
I need to stage materials from WM storage location (0001) to production line.
Generally in WM, material staging happens by staging the materials to the PSA. So I create PSA and assign it to the workcenter.
Next step is to assign this PSA to the storage location. My question, is this storage location a different storage location or is it the same 0001 location?
Thx