Hi Gurus,
In SWEQADM, it shows there are 100 events still to be delivered. My event background job SWEQSRV is scheduled correctly. But the problem is that even though after the job SWEQSRV is finished, there are still 100 events need to be delivered. I check the log of the job it shows that "SWEQSRV is not active - cancellation not possible!"
How to deliver my events again? By the way, I check in SWEL that these events have been delivered once, but status is "Feedback after error", and "Event put in queue".
Thanks,
Wang