Dear All,
At my client side i am able to post consumption before GRN date (Within a same period)
For Example- If i am doing GRN on 20th February and while MB1A i am putting date 10th February (which is before GRN date and even batch is also not created on that date) system is allowing me to back post consumption for that batch.
What is the reason behind?
Naren