Rounting

67 Views

How do we do routing of this process.

We've got 4 material A, B, C & D (all chemicals). I need to take them through following process to convert into a final product.

All these processes shall be carried out in one work center say R1

Processes:

1. Take A in R1 - 10L

2. Add B in it - 3kg

3. Mix these for 25 minutes

4. Heat this mixture for 20 miinutes

5. Add 5kg of C to this

6. Mix for 5 minutes

7. Cool the whole mass for 30 minutes

8. Perform an in process quality check (30 minutes)

9. Add 5 kg C (again) to the mass

10. Mix the mass for 15 miutes

11. Make final quality check (QC)

on checking this product was found to be deviating from required specifications and needs to be re-worked

(though the whole mass is still in R1 as we performed the QC check without taking it off R1)

For reworking the mass we need to follow below mentioned steps;

1. Add 5L of A to the mass

2. Mix for 15 minutes

3. Perform final QC check

The product passes QC parameters hereafter & needs to be packed in containers "X"