Hi ,
I did FPM application configuration and component configuration. When I test from Application configuration it works perfectly. But when I run it from SE80 application->test it dumps. Below is the dump. Can some one help me please.
The following error text was processed in the system G1E : The current application triggered a termination with a short dump.
The error occurred on the application server daladg94_G1E_00 and in the work process 0 .
The termination type was: RABAX_STATE
The ABAP call stack was:
Method: ADD_COMPONENT of program CL_FPM_COMPONENT_MANAGER======CP
Method: ATTACH_COMPONENT_TO_USAGE of program CL_FPM_COMPONENT_MANAGER======CP
Method: PROCESS_EVENT of program CL_FPM========================CP
Method: RUN_EVENT_LOOP of program CL_FPM========================CP
Method: IF_FPM~RAISE_EVENT of program CL_FPM========================CP
Method: IF_FPM~RAISE_EVENT_BY_ID of program CL_FPM========================CP
Method: HANDLEDEFAULT of program /1BCWDY/AZIHGDV0Q68VOQXALE9B==CP
Method: IF_WDR_VIEW_DELEGATE~WD_INVOKE_EVENT_HANDLER of program /1BCWDY/AZIHGDV0Q68VOQXALE9B==CP
Method: INVOKE_EVENTHANDLER of program CL_WDR_DELEGATING_IF_VIEW=====CP
Method: DISPLAY_TOPLEVEL_COMPONENT of program CL_WDR_CLIENT_COMPONENT=======CP