Hi,
We are encountering the following when we are planing to release the cost estimation(CK24) for one material.
Price changes for material 440-00386 is not possible
Message no. C+811
In Material Master(semi finished goods with price control as S) the future price updated(i.e material has been marked),but not able to release it.
We have material ledger activated with mat price ind as 3. ECC 6.0 is the version
Do suggest.
Regards,