on 02-17-2011 3:26 PM
Hello, we are just with sap implemented but i don't know many things yet. The issue is that the quality certificates shows the final date of production as manufacturing date but, what i need is that the certificate shows the initial date of production as the manufaturing date. After, from the manufacturing date i want sap calculate the best before date and to show it in the certificate.
Could some one help me?
thanks.
Jrdz
Check active user exits in your system or talk to PP guys.
Standard SAP by default would work as you want. I think some user exit is preventing the standard functionality.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Typically this is controlled by your production people. When the receipt the material they have the ability to enter/change the production date. The production date is visible in the batch record, (msc3n), and can be changed updated via msc2n.
In the cert you shouldn't have to worry about figuring out the production date, it should print what has been maintained. If what is maintained is incorrect then the process should be reviewed to make sure it is correct.
FF
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.