Hi All,
We have a scenario where the same material is placed in different bins (currently managed as different production storage locations). We are thinking of implementing the WM material staging. Can any of you give some tips in how to do the replensihment once these production storage locations are converted to one production storage type.
The challenge is once the above is done the same material will be in multiple bins across the different work centres/production supply areas and we need to carryout the replenishment for the same.
Any inputs will be very helpful.
Regards,
Ramachandra DN