Hi Everyone,

Material type := HAWA

My material procurement type = F i.e. External Procurement.

MRP Type = ND in Production server , and VB in Quality

Lot Size = EX

Material Status :- 15 Pre-release both for Quality and production server

The Material is bulk material and bulk material indicator is set.

Purchasing View is also maintained for the same.

Planning Strat = Z5 Company specific

Special procurement key:- Z7 Company specific

I am running MD02 with following parameters.

Create Pur Req =1, PR

Create MRP List = 1, MRP List

Delivery Schedule = 3, Schedule Lines

Planning Mode = 2 Re- Explode BOM & Routing

Scheduling = 1

Issue:

After MRP run, system is generating PR, Though with MRP type ND purchase requisition should not be generated.

Observation:- Looks like there is inconsistency of material date in Quality and production server.

When I tried to run the planning , The Error message was generated"Material status is set to pre- release.

After changing the material status to 20 (Active ) , when we run the MRP , The error message is generated "Material is not planned automatically "

We havent been able to locate the root cause so far

Please guide us

Thanks in Advance,

Ayaz

Edited by: Ayaz Alam Khan on Feb 16, 2011 2:41 PM