Hi Everyone,
Material type := HAWA
My material procurement type = F i.e. External Procurement.
MRP Type = ND in Production server , and VB in Quality
Lot Size = EX
Material Status :- 15 Pre-release both for Quality and production server
The Material is bulk material and bulk material indicator is set.
Purchasing View is also maintained for the same.
Planning Strat = Z5 Company specific
Special procurement key:- Z7 Company specific
I am running MD02 with following parameters.
Create Pur Req =1, PR
Create MRP List = 1, MRP List
Delivery Schedule = 3, Schedule Lines
Planning Mode = 2 Re- Explode BOM & Routing
Scheduling = 1
Issue:
After MRP run, system is generating PR, Though with MRP type ND purchase requisition should not be generated.
Observation:- Looks like there is inconsistency of material date in Quality and production server.
When I tried to run the planning , The Error message was generated"Material status is set to pre- release.
After changing the material status to 20 (Active ) , when we run the MRP , The error message is generated "Material is not planned automatically "
We havent been able to locate the root cause so far
Please guide us
Thanks in Advance,
Ayaz
Edited by: Ayaz Alam Khan on Feb 16, 2011 2:41 PM