Dear experts,
I encountered a strange problem when doing costign run use CK40N.
I created a costing run on 23.12.2010 In the costing run the validity was set from 01.01.2011 to 31.12.2011, I did all the steps except release, all steps were done successfully
I released costing run on 01.01.2011, but when I hit a material to check the costing date, found the costing was only avaliable to 31.01.2011 not 31.12.2011.
I was wondering if any actions or modifications done will affact on the costing date of material?
Have you ever meet this problems?
Please give me some help.
Thanks for your time and concern.
Regards,
Anna