Hi,
My Release Strategy is based on the below mentioned Criterial for overall release.
1) Document Type of PR
2) Material Group of PR
3) Plant of the PR
4) SAP ID
5) Total value of teh PR
Prob.
if the PR is created by two SAP id , suppose two line item with two different SAp id Release strategy is not picked up.
One of the Material Group characteristic value is kept blank as if a single SAP id is involved for multiple line items in the PR , then Release strategy can be picked .
Regards.