Skip to Content
0
Former Member
Feb 16, 2011 at 04:35 AM

Replenishment from putaway to pick location

130 Views

Dear folks

I have a scenario with my current assignment. Just been thinking and trying out several options to see if we can do some work around to map it with the standard system.

The client has got 2 storage locations that are WM managed. One is GR location where the material will be putawayed and other is pick location from where the material will be shipped. Based on the OB delivery requirement that material will be transferred and placed in the pick location where it will be finally packed and shipped. Is there a function in SAP that can automatically trigger TR/TO's to replenish stocks from the GR location to pick location based on the material availability in the pick location? Basically the TR/TO's has to be created to transfer stock from GR location to Pick location seeing the storage space availability/quantity that can be stored in the pick location.

Can this be mapped using capacity planning coupled with replenishment control in WM? And if so any guidelines regarding that? Is there any other solution to map this requirement?

Thanks

Ak