We are experiencing great issues on our lead time calculation because we cannot switch between working days and calendar days in the MRP run in the material master. However, the SAP note 603098 mentions the transaction WPDTC and that it from 4.7 and onwards is possible to switch between working days and calendar days in MM.
However, running this transaction I only see a report that can calculate some lead time; not the actual possibility to switch between working days/calendar days in MM?
Has anyone been able to achieve this; or is this transaction really only a tool for calculation?