Skip to Content
0
Feb 15, 2011 at 09:11 AM

Movement types for dismantling an equipment and putting in store

564 Views

Hi All,

I am using refurbishment scenario.

I have a equipment with material number and serial number. First I have to dismantle it from functional location.

Q. Now my requirement is that I have to put that material in store in valuation type C3.

At the time of installation material had C2 valuation type so now when I am putting it back to store via IE4N with 501 movement type it is allowing me to post only in C2 valuation.

Q. What is the standard procedure to put the material in store in C3 valuation type after dismanlting. Which movement type is used?

Sundar