Hi Gurus,
In my scenario I have WM and Im checking bin capacity, everything works fine but I have materials 5 which are very large, these materials can only be placed using physically 2 storage bins, It is handled in pallets because phisically is a pallet, but it has extra large dimension so it uses 2 storage bins (the one assigned by the system and the one next to it) so how can I configure this?
How to tell the system that the next bin is also use so in a future receipe system knows this is not available??
Regards.
Julio