ChaRM with Central CTS with a two tier system

Former Member
0 Kudos

Hello,

I have a ChaRM with cCTS with a phyical two tier system. For the cCTS structure, we created a virtual system for the consolidation system.

The transport route was re rcreated with the Dev->QA->Prod structure, the client targets were define as well. In the cCTS route the import tabs were filled in with the source and targets.

The virtual system was setup in the LMDB as a technical system and in SMSY tagged as a virtual system. The project consistency check was green and identified it as a virtual system. The cCTS configuration validated it with no errors.

When processing the change document for "In Development" to "To be tested", the status does not move to "To be tested".

We did set up a proof of concept and are using a three tier system and all works good for the three tier.

Has anyone configured the scenario of ChaRM with cCTS and a three tier using a virtual system? How is the TOC import and the Header(original transport) import handled since it is a virtual system.

Inputs will be much appreciated.

Thanks,

Gary Manaoat