strategy group selection

18 Views

For a material i have set 40 as strategy group in the material master in MRP 3 View and strategy group as 10 in the MRP group which is attached to this material in MRP 1 View. Now which will be considered by the system during MRP.

As per my understanding settings in Material master have priority on setting s in MRP group and settings in MRP group will have prioirty on settings in plant parameters. Is my under standing correct. Then system should consider strategy 40. Is my under standing correct. Plz clarify.