Hi,
I need to change the validity of a BOM which has been mistaken set as starting from 29.12.2011 instead of 11.02.2011.
I've tried creating a new ECR with the correct validity, but when I try changing the BOM trough the new ECR the system is warning me that the validity date from the ECR is no longer valid.
How can I correct the validity date of the BOM in this case?
Thanks,