Hi
I want to skip some of the characteristics in my inspection & wants to check it every after 2 lot (means in 3rd lot). For that I have created dynamic modification rule on the lot creation basis, assigned in the inspection plan & for those MIC, for which I want to apply DMR. In initial case it is working absolutely fine & generates the inspection lot & skipped MICs as per my requirement. Now in my 3rd lot if MIC is rejected then by thumb rule I have to inspect in the 4th lot but system is skipping it in the 4th lot & I have to open the MIC & forced to do it manually. Subsquently succeeding lot data gets wrong.
Is there any way to generate correctly?
Regards
ACP