MSC2n next inspection lot to be calculated from the production date

71 Views

Hi gurus,

My query is

1. In Tcode MSC2n, next inspection lot is to be calculated from the production date and not from last goods movement date. is it possible to get next inspection lot to be calculated from the production date.

2. how to make automatic creation of inspection lot in SAP based on the next inspection date. Right not, it is being done manually using T-code QA07.

thanks in advance