on 02-10-2011 6:22 AM
Dear All,
I have automatic goods receipt via Operation control key.
But Some time at the time of Confirmation of Process order through COR6, the automatic GR is not posted. Then I have to manually post 101 for the material.
I have checked the error in COGI, the error is "Date Error!! Open Period is 08.02.2011". Can anybody tell me what is this error.
Thanks and regards,
Girish
Dear Girish,
Your period for the Feb month is still not open, thats
why you get this error, this may be due to your previous periods are not closed.
So first check the details in the MMRV which states the
current and previous period. then go to the MMPV and
close the period of jan, then system will open the
period of feb.
Please check and revert.
Thanks,
Hrishi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Chack current field of ur company code in MM02 acounting1 view...
Current period is not opened then open from MMPV or take help of MM and FI guys.
Arun
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.